Skip to content

Country

FREE CAD SHIPPING ON ORDERS OVER $175 // ORDER TIMELINES CURRENTLY EXTENDED DUE TO MATERNITY LEAVE/REDUCED CAPACITY // US SHIPPING TEMPORARILY UNAVAILABLE DUE TO TARIFFS // THANKS FOR YOUR PATIENCE AND SUPPORT! <3

Design Your Own - Narrow Biothane Long Lead

DogDog Goose

Regular price $85.00

Unit price per 

Length:
Hardware:
Style:

only 0 left in stock

BIOTHANE LONG LEAD

This listing is for a 5/8" wide biothane long lead with solid metal hardware. Long Leads also come with a biothane wrap tab to help secure your leash and prevent tangling when it's wound up for storage.

Made of durable, waterproof synthetic biothane material with solid metal hardware, this leash is sturdy enough for even the toughest canines! Design has been thoroughly swim, tug, scratch, roll-in-mud tested on my spotted canine.   

**ABOUT BIOTHANE**

- Biothane is a synthetic material composed of an embossed "leather-like" PVC outer layer and a nylon core. It is waterproof and stinkproof which is great for dogs who love to swim, and the colour will remain bright for years to come. 

- Biothane can be cleaned with warm water and soap, or a cloth with a dab of rubbing alcohol. Care instructions are included with every item when shipped. In rare events, a small amount of colour transfer to the fur is possible, however it is non-hazardous and will clean with soap and water.

- Colours may vary from the photographs as each monitor will show colours differently. 

- All metal hardware components carry a lifetime warranty - in the rare event of a failure, just contact the shop and replacement parts will be sent out.

Please don't hesitate to contact with any questions or special requests prior to purchasing.


                                        
Close (esc)

ORDER TURNAROUND TIMES

PLEASE NOTE WE ARE CURRENTLY OPERATING AT REDUCED CAPACITY DUE TO MATERNITY LEAVE SO ORDER TURNAROUND TIMES MAY BE EXTENDED FOR ALL ITEMS. THANK YOU SO MUCH FOR YOUR PATIENCE AND SUPPORT!

Age verification

By clicking enter you are verifying that you are old enough to consume alcohol.

Search

Added to cart